About PowerCore

A Chinese power equipment manufacturer with two decades of engineering, manufacturing and global delivery experience.

Who We Are

Two Decades of Powering Progress

Founded in 2004 in Wuhan, China, PowerCore started as a small transformer workshop with a single principle: no equipment leaves the factory until it has passed every test we would want on our own grid.

Today our 120,000 m² manufacturing base produces transformers, switchgear, distribution panels and cables for customers in more than 50 countries — from rural electrification programs to hyperscale data centers.

We remain a manufacturer first: engineering in-house, testing every batch, and standing behind our equipment with real warranty support.

What We Stand For

The values that shape every design decision and delivery

Reliability

Equipment tested beyond the standard, because downtime is never just a number.

Safety

Arc-proof enclosures, fail-safe interlocks and certified materials as standard.

Innovation

Amorphous cores, SF6-free switchgear and smart monitoring, developed in-house.

Partnership

Engineer-to-engineer support from first inquiry through commissioning.

Milestones

Our Journey

2004

Founded in Wuhan

Starts as a transformer workshop with 40 employees and a single test bench.

2008

First International Shipment

First export order delivered to Southeast Asia; export business begins.

2012

ISO 9001 & CE Certification

Quality management system certified; CE marking achieved for key products.

2015

220 kV Production Line

High-voltage transformer line commissioned, expanding the range to 220 kV.

2018

Overseas Service Network

Regional offices opened; 24/7 after-sales support established across 5 regions.

2021

Smart Factory Upgrade

Automated winding, testing and traceability systems go live on the shop floor.

2024

1000th Project Delivered

Milestone project completed; factory capacity reaches 12,000 MVA per year.

Manufacturing & Quality

Built in a Smart Factory

Our Wuhan facility spans 120,000 m² with automated winding lines, computer-controlled drying and vacuum oil treatment, and a full high-voltage test laboratory.

Every transformer, panel and cable run is tracked by serial number from raw material to final test report — so we can trace, reproduce and improve, batch after batch.

120,000 m² facility HV test lab Serial-level traceability 12,000 MVA / year
20+
Years of Experience
50+
Countries Served
1000+
Projects Completed
300+
Skilled Employees

Partner With PowerCore

Whether you need a single transformer or a turnkey substation, we are ready to engineer it with you.

Get in Touch